Dr. Sauer & Partners' Andreas Spiegl takes to the stage alongside CoLOR's Steve Nuttall and LU's Richard Watts. Their presentation will describe the challenges and solutions from the design stage through to the successful execution of tunnelling work for London Underground’s Bond Street Station Upgrade project. Told from the perspective of the SCL designer and the Contractor working in a One Team environment, through maximising innovation and utilising the latest technology they pushed the SCL design boundaries and developed a safe system of work by minimizing the impact on infrastructure whilst optimising the excavation times to create necessary additional underground space. www.britishtunnelling.org.uk