Owner: | |||||
Client: | |||||
Service: | Detailed design including tender documentation
|
||||
Estimated cost: | Commencement: | May 28, 1991
|
Completion date: | October 19, 1992
|
|
Location: | Wiesbaden, Hesse Germany |
||||
Technical data: | City sewage system: NATM tunnel under compressed air, construction of new scheme located 1 m below operating old brick lined sewage pipe. |
||||
Geology description: | Tertiary clay, gravel and mud, (ground water table above tunnel roof). |
||||
Categories: | |||||
Bid cost: | Final cost: | $1,500,000
|
|||
Service areas: |
City sewage system: NATM tunnel under compressed air (0.25 bar), construction of new scheme located 1m below operating old brick lined sewage pipe. Steel plate lining is closed to the face (2 m behind) to reduce air pressure losses.