Owner: | |||||
Client: | |||||
Service: | Detailed Design including Contract Documents
|
||||
Estimated cost: | Commencement: | April 30, 1997
|
Completion date: | October 22, 2003
|
|
Location: | Boston, MA United States |
||||
Technical data: | Ramp S-N, two lane highway, total length 600 ft, span 41 to 48 ft. Doorframe Slab Method adopted in areas where the cover was < 10 ft. Utility room breakout and pump station shaft. Reinforced shotcrete primary lining; waterproofing system with a reinforced conrete secondary lining. |
||||
Geology description: | Fill, Organic Silt, Fine Sand and Silt, Alluvium, Marine Clay, Glaciomarine Drift and Outwash, Glaciolacustrine sediments overlying Argillite and Hornfels bedrock at depth. Groundwater approximately 8 ft below ground surface. |
||||
Categories: | |||||
Service areas: |