Tottenham Court Road Station Upgrade Execution

Owner:
Client:
Service:
Design of SCL tunnels and access shafts linked to both Central and Northern line. Supervision during construction.
Estimated cost: Commencement:
March 01, 2011
Completion date:
January 01, 2016
Location:
Oxford Street
London
W1D 1AN
United Kingdom
Technical data:
Geology description:

London Clay formation

Geology types:
Activity:
Categories:
Bid cost: Final cost:
£480 million GBP
Service areas:
Tunneling under:
Overburden:
10-20m
Excavation area:
23-104m2
Tunnel length:
13-104m
Description

The major upgrade to the LU Tottenham Court Road Station has been proposed to relieve congestion, achieve step-free access and modernise the station. The major elements of the station upgrade comprised a new enlarged sub-surface ticket hall, a fire-fighting access / emergency escape shaft linked to both Central and Northern lines, a triple escalator barrel, and concourses to the Northern and Central lines. In the latter concourse two new overbridges were included to lead to the platforms via new stairs and lifts. For the tunnelling works, a particularly challenging part was to design and construct the two SCL overbridges over the operational Central line.

SCL side drift tunnel
Aerial view of the construction site
Sprayed Waterproofing Membrane
SCL Crosspassage
SCL Tunnel, overbridging operational Central Line Tunnel
SCL Excavation through existing Structure