Bluewater Quarry Haulage Tunnels

Owner:
Client:
Service:
Detailed design and construction supervision
Estimated cost: Commencement:
October 24, 1995
Completion date:
November 29, 1995
Location:
Nr. Dartford
Kent
United Kingdom
Technical data:

Twin tunnels, 26 ft (8 m) span, length: 246 ft (75 m); 8 inch (200 mm) reinforced single pass shotcrete lining, 10 year design life.

Geology description:

Head deposits overlying upper Chalk. Grades III/II at tunnel elevation.

Geology types:
Categories:
Bid cost: Final cost:
$500,000