Owner: | |||||
Client: | |||||
Service: | Member of board of consultants
|
||||
Estimated cost: | Commencement: | October 29, 1990
|
Completion date: | December 29, 1995
|
|
Location: | Athens Greece |
||||
Technical data: | Earth dam, two inclined spillway shafts and tunnels (12 m ID, inclined length 140 m, horizontal length 550 m), diversion tunnel (500 m long), power tunnel (8,5 m ID, 480 m long), surface power house and 3 km long grouting tunnel. |
||||
Geology description: | Slope wash, Limestone, Siltstone, Sandstone, Shale, Cherts. |
||||
Categories: | |||||
Service areas: |