Owner: | |||||
Client: | |||||
Service: | Design of tunnels where they intercept with existing building foundation piles (i.e. at four building locations).
|
||||
Estimated cost: | Commencement: | August 01, 2013
|
Completion date: | May 01, 2022
|
|
Location: | London London EC3V 3LA |
||||
Technical data: | |||||
Geology description: | The geology comprises London Clay formation overlain by Quaternary superficial deposits and made ground. |
||||
Geology types: | |||||
Activity: | |||||
Categories: | |||||
Bid cost: | Final cost: | £563.8 million GBP
|
|||
Service areas: | |||||
Construction methods: | |||||
Tunneling under: |
Bank Station is a London Underground station located in the City of London financial district. It is a key interchange served by five existing lines. The Bank Station Capacity Upgrade (BSCU) comprises the construction of new tunnels adjacent to and connecting with the existing tunnels. The capacity upgrade includes the construction of 540 metres of running tunnel intercepting with existing foundation piles at four no. building locations. A bespoke solution was developed for each of the buildings and the building impact was assessed in detail.