| Owner: | |||||
| Client: | |||||
| Service: | Detailed design and construction supervision
|
||||
| Estimated cost: | Commencement: | October 24, 1995
|
Completion date: | November 29, 1995
|
|
| Location: | Nr. Dartford Kent |
||||
| Technical data: | Twin tunnels, 26 ft (8 m) span, length: 246 ft (75 m); 8 inch (200 mm) reinforced single pass shotcrete lining, 10 year design life. |
||||
| Geology description: | Head deposits overlying upper Chalk. Grades III/II at tunnel elevation. |
||||
| Geology types: | |||||
| Categories: | |||||
| Bid cost: | Final cost: | $500,000
|
|||
| Service areas: | |||||