Owner: | |||||
Client: | |||||
Service: | Detailed design and construction supervision
|
||||
Estimated cost: | Commencement: | October 24, 1995
|
Completion date: | November 29, 1995
|
|
Location: | Nr. Dartford Kent |
||||
Technical data: | Twin tunnels, 26 ft (8 m) span, length: 246 ft (75 m); 8 inch (200 mm) reinforced single pass shotcrete lining, 10 year design life. |
||||
Geology description: | Head deposits overlying upper Chalk. Grades III/II at tunnel elevation. |
||||
Geology types: | |||||
Categories: | |||||
Bid cost: | Final cost: | $500,000
|
|||
Service areas: |