Ilarion Hydroelectric Project (160 MW)

Owner:
Client:
Service:
Member of board of consultants
Estimated cost: Commencement:
October 29, 1990
Completion date:
December 29, 1995
Location:
Athens
Greece
Technical data:

Earth dam, two inclined spillway shafts and tunnels (12 m ID, inclined length 140 m, horizontal length 550 m), diversion tunnel (500 m long), power tunnel (8,5 m ID, 480 m long), surface power house and 3 km long grouting tunnel.

Geology description:

Slope wash, Limestone, Siltstone, Sandstone, Shale, Cherts.

Categories:
Service areas:
General Layout (Public Power Corp.)
Sections through Tunnels (Public Power Corp.)
Robbins 6.6 m diameter TBM - partly erected