| Owner: | |||||
| Client: | |||||
| Service: | Alternative design study
|
||||
| Estimated cost: | Commencement: | October 21, 2001
|
Completion date: | October 21, 2001
|
|
| Location: | New York, NY United States |
||||
| Technical data: | Two twin tunnels, rail and highway, with a total length of 2,000 ft (610 m) each. |
||||
| Geology description: | Hydraulically filled sand, organic silt, clay and peat, glacial sand, non-compacted fines and occasional gravel. |
||||
| Geology types: | |||||
| Categories: | |||||
| Bid cost: | Final cost: | $42,000,000
|
|||
Design study on feasibility of construction of tunnels beneath active airport taxiway using systematic dewatering wells and Door Frame Slab Method.