| Owner: | |||||
| Client: | |||||
| Service: | Preliminary design using NATM
|
||||
| Estimated cost: | Commencement: | Completion date: | |||
| Location: | Dallas, TX United States |
||||
| Technical data: | Two lane road tunnel, 1650 ft total length, NATM construction under existing runways in mixed face conditions. |
||||
| Geology description: | Soil, weathered and unweathered Limestone (Austin Chalk). |
||||
| Geology types: | |||||
| Categories: | |||||
| Service areas: | |||||