Owner: | |||||
Client: | |||||
Service: | Design Review, Alternative design
|
||||
Estimated cost: | $4,000,000
|
Commencement: | February 01, 1995
|
Completion date: | January 01, 2004
|
Location: | Stockholm Sweden |
||||
Technical data: | Binocular Road Tunnel Dimensions: 33,6m wide x 11,9m high Length: 40m x 3 lanes NATM excavation with Barrel Vault Method, through Bedrock with extensive tree / root system. |
||||
Geology description: | Bedrock, Glacial Till, Gravel and Sand |
||||
Categories: | |||||
Service areas: |