Ortsumfahrung B311

Owner:
Client:
Service:
General Consultant for Design and Construction
Estimated cost:
$21,000,000
Commencement:
March 22, 1994
Completion date:
December 01, 1994
Location:
Kirchham, Salzburg
Austria
Technical data:

New Two Lane Roadway Tunnel constructed using NATM and Doorframe Slab Method, included 300m (900 ft) of approach ramps. Dimensions: Height 10.30m (~34’ ft) x Width 11.50m (~38 ft) Length: 700m (2,229 ft) Section: ~94m2 (1,033 ft2) Roadway Overburden: 5.15m (~17 ft)

Geology description:

Sandstone