Owner: | |||||
Client: | |||||
Service: | Preliminary design and settlement analysis for various options and layouts.
|
||||
Estimated cost: | Commencement: | January 31, 1996
|
Completion date: | May 31, 1996
|
|
Location: | Russel Square, London |
||||
Technical data: | Preliminary design studies for the construction of a 4-way escalator shaft using NATM. Escalator shaft 11.5 m span, approx. 60 m long by 32 m deep, initial lining 300 mm thick reinforced sprayed concrete. |
||||
Geology description: | Made Ground, Alluvium, London Clay. |
||||
Geology types: | |||||
Categories: | |||||
Service areas: |