| Owner: | |||||
| Client: | |||||
| Service: | Preliminary design and settlement analysis for various options and layouts. 
   | 
        ||||
| Estimated cost: | Commencement: | January 31, 1996 
   | 
          Completion date: | May 31, 1996 
   | 
        |
| Location: | Russel Square, London  | 
        ||||
| Technical data: | Preliminary design studies for the construction of a 4-way escalator shaft using NATM. Escalator shaft 11.5 m span, approx. 60 m long by 32 m deep, initial lining 300 mm thick reinforced sprayed concrete.  | 
        ||||
| Geology description: | Made Ground, Alluvium, London Clay.  | 
        ||||