Subway Lot 31b & 31c - Frankfurt/Main

Owner:
Client:
Service:
Value Engineering: Design Consultant for a Mined Crossover Section
Estimated cost: Commencement:
March 01, 1981
Completion date:
June 01, 1983
Location:
Frankfurt/Main , Hesse
Germany
Technical data:

2 x 3 single track tubes with corssovers. Excavation section: 40 m² each.

Geology description:

Frankfurt Clay (silt and sand), waterbearing.

Categories:
Service areas:
Description

3 running tunnel each approximately 170 m long

Hole at surface