| Owner: | |||||
| Client: | |||||
| Service: | Technical Consultant for Design, Supervision of Construction and Arbitrator
|
||||
| Estimated cost: | Commencement: | December 01, 1980
|
Completion date: | June 01, 1984
|
|
| Location: | Frankfurt/Main , Hesse Germany |
||||
| Technical data: | Subway, 2 parallel tubes (station and rumming tunnel), L = 2 x 900 m, full section: 35 m² (76 m²), Construction method: NATM. |
||||
| Geology description: | Weathered rock, Frankfurt Clay (clay and sand). |
||||
| Categories: | |||||
| Service areas: | |||||
L= 2*900m