Gall, V., Zeidler, K. |
London Bridge Station, Jubilee Line Extension |
Las Vegas, NV, USA |
June 24, 1997 |
|
Zeidler, K. |
Surface settlement due to the construction of the London Bridge station tunnels by NATM |
Wien, Austria |
April 1, 1997 |
|
Zeidler, K. |
Sprayed concrete linings |
Crowthorne, United Kingdom |
December 2, 1996 |
|
Mellors, T. |
Hard ground rock tunnelling |
Crowthorne, United Kingdom |
December 2, 1996 |
|
Sauer, G., Gall, V., Zeidler, K. |
NATM tunnelling seminar |
Santiago, Chile |
November 19, 1996 |
|
Sauer, G., Zeidler, K. |
Tunnel construction 2000 |
Ulm, Germany |
October 1, 1996 |
|
Zeidler, K. |
Sprayed concrete |
London, United Kingdom |
September 11, 1996 |
|
Sauer, Dr. G., Ugarte, E. and Gall, V. |
Instrumentation and its Implications DART Section NC-1B City Place Station Dallas TX |
Washington, DC, USA |
April 21, 1996 |
|
Sauer, G. |
Tunnel design and construction |
Stanford, CA, USA |
March 10, 1996 |
|
Sauer, G. |
Geotechnology in dispute resolution |
New York, NY, USA |
January 31, 1996 |
|
Sauer, G. |
NATM Teach-In |
London, United Kingdom |
March 16, 1995 |
|
Sauer, G., Zeidler, K., Marence, M. |
New Austrian Tunnelling Method applied in London Clay |
Novigrad, Croatia |
October 6, 1994 |
|
Sauer G., Gall V., Dietmaier P. |
Design of tunnel concrete linings using capacity limit curves |
Novigrad, Croatia |
October 5, 1994 |
|
Sauer, G. |
Tunnelling in builtover areas under shallow overburden |
Leipzig, Germany |
March 18, 1994 |
|
Fawcett, D., Smith, C. against Sauer, G. Muir Wood, A. |
Debate: New Austrian Tunnelling Method is not appropiate for use in London Clay |
London, United Kingdom |
February 17, 1994 |
|
Craig, R. |
Planning and Engineering of Heathrow Express |
London, United Kingdom |
November 18, 1993 |
|
Sauer, G., Crawford, H., McGuirk, A., Watson, A. |
Brno fast track system - application of NATM |
Brno, Czech Republic |
October 19, 1993 |
|
Sauer, G., Gall, V. |
Application of the NATM in soft ground and mixed face conditions for the Toronto Island Airport Tunnel |
Toronto, Canada |
October 7, 1993 |
|
Sauer, G., Gall, V., McGuirk, A. |
Opportunities on NATM station designs in the Rapid Transit Expansion Program (RTE) |
Toronto, Canada |
July 15, 1993 |
|
Sauer, G., Zeidler, K. and Gall, V. |
The Doorframe Slab Method, Barrel Vault Method and Conventional NATM |
Boston, MA, USA |
June 14, 1993 |
|