Main Menu

You are here

Presentations and lectures

Author Title Location Date Files
Sauer, G. The New Austrian Tunnelling Method Havana, Cuba February 1, 1984
Sauer, G. NATM - model investigation and research progress Moscow, Russia November 16, 1983
Sauer, G. The tunnels of the new High-Speed Railroad Net in Germany Moscow, Russia November 16, 1983
Sauer, G. Subways in Europe - state-of-the-art construction with shotcrete Moscow, Russia November 15, 1983
Sauer, G. Applying NATM - basic knowledge and new developments Leoben, Austria November 1, 1983
Sauer, G., Krimmer, H. Die Neue Österreichische Tunnelbauweise im U-Bahnbau. Rückblick und Ausblick Salzburg, Austria October 1, 1983
Sauer, G., Fecker, E., Frick, F., Gloetzl, R. Surveying and monitoring of historic monuments Zürich, Switzerland September 1, 1983
Sauer, G. Application of the New Austrian Tunnelling Method - its problems with technology and contracts Salzburg, Austria March 15, 1983
Sauer, G. NATM on the new line of the German Railroad Authorities Kassel, Germany March 1, 1983
Sauer, G. The New Austrian Tunnelling Method - application in urban areas in Europe Singapore, Singapore January 1, 1983
Sauer, G. Application of the New Austrian Tunnelling Method - its problems with technology and contracts Graz, Austria December 1, 1982
Sauer, G. The New Austrian Tunnelling Method - its application and costs Lisbon, Portugal November 1, 1982
Sauer, G. Kann man Tunnel berechnen? Theorie und Praxis der NöT Spindlerov Mlyn, Czech Republic September 1, 1982
Sauer, G., Geissler, N., Möker, H., Schrewe, F. Tunnelplanung der deutschen Bundesbahn in erdfallgefährdetem Gebiet Salzburg, Austria October 1, 1981
Muir Wood, A. M. and Sauer, Dr. G. Efficacy and equity of the management of large underground projects San Francisco, CA,, USA May 3, 1981
Sauer, G. The New Austrian Tunnelling Method Cordoba, Argentina December 1, 1980
Sauer, G. Cement and resin grounting in dam constructions Cordoba, Argentina December 1, 1980
Sauer, G. Application and new techniques of NATM in large underground openings Warsaw, Poland June 5, 1980
Sauer, G. New considerations on soft ground tunelling in urban areas, in-situ-measurements, model-investigations Gdansk, Poland June 1, 1980
Sauer, G. Tunnel instrumentation & in-situ observations London, United Kingdom March 1, 1980

Pages