Owner: | |||||
Client: | |||||
Service: | Consultant for the Overall Review and Checking of the NATM Design. Expert Witness for Parliamentary Committee – Queen’s Counsel
|
||||
Estimated cost: | Commencement: | October 01, 1992
|
Completion date: | ||
Location: | London |
||||
Technical data: | L= 2x8 km railway tunnel in Central London; 5 Stations, 4 utilizing NATM design between Bond Street and Liverpool Street Stations. |
||||
Geology description: | Made Ground, Terrace Gravels/Alluvium, London Clay, Woolwich and Reading Beds, Thanet Sands, Upper Chalk. |
||||
Categories: | |||||
Service areas: | |||||
Construction methods: |