| Owner: | |||||
| Client: | |||||
| Service: | NATM alternative design, FEM design computations for NATM and TBM driven tunnels, ground classification and ground stabilization measures
|
||||
| Estimated cost: | Commencement: | December 28, 1989
|
Completion date: | December 28, 1994
|
|
| Location: | Dallas, TX United States |
||||
| Technical data: | 4 single-track light rail tunnels, total length 11,500 ft (3505 m). |
||||
| Geology description: | Shale, clay, terrace sands and gravels (below groundwater level). Weathered and unweathered Limestone (Austin Chalk). |
||||
| Geology types: | |||||
| Categories: | |||||
| Bid cost: | Final cost: | $50,000,000
|
|||
| Service areas: | |||||