Bank Station Capacity Upgrade - Defects Survey

Owner:
Client:
Service:
Defects surveys of the London Underground existing facilities predicted to settle 1 mm or more due to the planned station upgrade works.
Estimated cost: Commencement:
August 01, 2013
Completion date:
May 01, 2022
Location:
London
London
EC3V 3LA
United Kingdom
Technical data:
Geology description:

The geology comprises London Clay formation overlain by Quaternary superficial deposits and made ground.

Geology types:
Activity:
Categories:
Bid cost: Final cost:
£563.8 million GBP
Service areas:
Construction methods:
Tunneling under:
Description

Bank Station is a London Underground station located in the City of London financial district. It is a key interchange served by five existing lines. The Bank Station Capacity Upgrade (BSCU) comprises the construction of new tunnels adjacent to and connecting with the existing tunnels. Defects surveys of the LU existing facilities predicted to be impacted by the BSCU works had to be carried out before construction started. All existing facilities expected to be within the 1 mm settlement contour were inspected for defects.

Defects survey in the existing running tunnel
Defects survey on the existing station platform