Service: | NATM Excavation and Support Design
|
||||
Estimated cost: | Commencement: | July 01, 2001
|
Completion date: | October 01, 2003
|
|
Location: | Carinthia Austria |
||||
Technical data: | Two Lane Highway Tunnel Length: 7,047 ft (2,1km); Height: ~35 ft x ~29 ft; Section: ~840 ft2 (78.4m2) Excavation included 4 vehicular cross passages connecting existing east tunnel. Constructed using two headings from North (drill-blast) and South (mined-excavator); Grouted pipe arch for pre-support and rock anchors where needed. |
||||
Geology description: | Difficult tunneling conditions as result of the presence of the Lavantal fault, un-favorable bedding and severe jointing of gneiss and mica schists. |
||||
Categories: | |||||
Bid cost: | Final cost: | $38,000,000
|
|||
Service areas: | |||||
Construction methods: |