Owner: | |||||
Client: | |||||
Service: | Design of a MIP Lift Shaft and Access Cross Passages to Existing Station Platform
|
||||
Estimated cost: | Commencement: | March 21, 1999
|
Completion date: | January 01, 2001
|
|
Location: | London |
||||
Technical data: | New subway station platform access shaft. Connection from main ticket hall to underlying (bi-secting) platform cross adit (cast iron liner breakout). The design accommodates difficult existing station (spatial) encroachments by utilizing an elliptical shape with changes in size, axis and shape (from 3m to 6.5m). |
||||
Geology description: | London Clay overlaying Reading Beds at depth. |
||||
Categories: | |||||
Service areas: |