C103 Escape Shafts

Owner:
Client:
Service:
Design of Temporary Support
Estimated cost: Commencement:
May 01, 1996
Completion date:
December 01, 1996
Location:
London
United Kingdom
Technical data:

Design of temporary shotcrete lining (150 mm thick) to support excavation for a perimiter r.c. beam at the base of the escape shaft piled walls. Shotcrete required to support the ground due to the foundations of a live railway viaduct located 2 m from the shaft walls.

Geology description:

Made Ground, Alluvium/Terrace, Gravels London Clay