Main Menu

You are here

Crossrail Eastern Running Tunnels

Owner:
Client:
Service:
Shaft and tunnel design, engineering support, geotechnical engineering and site supervision services.
Estimated cost: Commencement:
February 01, 2011
Completion date:
December 01, 2012
Location:
London
London
EC1M 6BY
United Kingdom
Technical data:
Geology description:

Geological locations of the cross passages vary from London Clay to Lambeth Group and Thanet Sands.

Geology types:
Activity:
Categories:
Bid cost: Final cost:
£500 million GBP
Service areas:
Construction methods:
Excavation area:
50-130m2
Tunnel length:
15m
Description

Contract C305 is the biggest design-bid-build construction contract of the Crossrail (CRL) project and includes the eastern running tunnels of CRL's central section with launch shafts and SCL launch adits for TBMs at Limmo Peninsula, SCL caverns and launch adits for TBMs at Stepney Green and 10 SCL cross passages between the running tunnels with lengths up to 30m. At the Limmo Peninsula site a 40m deep and 30m diameter SCL shaft was built. At the shaft bottom in Stepney Green, two 30m long and up to 10m wide SCL launch adits were constructed followed by two 14m high and up to 18m wide, SCL caverns with single sidedrift and double sidedrift cross sections.

Limmo Main Shaft
Limmo Auxiliary Shaft bottom
Platform Tunnel West - Excavation - TBM Tunnel Enlargement
3D Model Limmo Auxiliary Shaft
Limmo Shafts and Tunnel layout - left Auxiliary Shaft - right Main Shaft