| Owner: | |||||
| Client: | |||||
| Service: | Consultant, rehabilitation design, supervision of rehabilitation work
|
||||
| Estimated cost: | Commencement: | December 30, 1989
|
Completion date: | December 30, 1991
|
|
| Location: | Lienz , Tyrol Austria |
||||
| Technical data: | Road tunnel 2 lanes, L = 5180 m (17,000 ft), cross section 70 m² (750 sqft) approx. The tunnel entrances are located approximately 1650 m (5,410 ft)a.s.l. |
||||
| Geology description: | Gneiss, amphibolite, amphibolite schists, schist (green schist). |
||||
| Geology types: | |||||
| Categories: | |||||
| Bid cost: | Final cost: | $3,500,000
|
|||
| Service areas: | |||||