Graebnertunnel Westroehre

Owner:
Client:
Service:
NATM Excavation and Support Design
Estimated cost: Commencement:
July 01, 2001
Completion date:
October 01, 2003
Location:
Carinthia
Austria
Technical data:

Two Lane Highway Tunnel Length: 7,047 ft (2,1km); Height: ~35 ft x ~29 ft; Section: ~840 ft2 (78.4m2) Excavation included 4 vehicular cross passages connecting existing east tunnel. Constructed using two headings from North (drill-blast) and South (mined-excavator); Grouted pipe arch for pre-support and rock anchors where needed.

Geology description:

Difficult tunneling conditions as result of the presence of the Lavantal fault, un-favorable bedding and severe jointing of gneiss and mica schists.

Categories:
Bid cost: Final cost:
$38,000,000
Service areas:
Construction methods: