| Service: | Alternative NATM Design and Instrumentation
|
||||
| Estimated cost: | $50,000,000
|
Commencement: | April 30, 1985
|
Completion date: | May 31, 1993
|
| Location: | Washington, DC United States |
||||
| Technical data: | Two single track running tunnels, L= 6,170 ft (1880m) each, (E Line) 3 Shafts and Cross Adits |
||||
| Geology description: | Clay, sandy clay and sand, parts with some gravel and occasional boulders, decomposed bedrock and weathered bedrock. |
||||