Greenbelt Route Section E8a

Owner:
Client:
Service:
Alternative NATM Design and Instrumentation
Estimated cost:
$50,000,000
Commencement:
April 30, 1985
Completion date:
May 31, 1993
Location:
Washington, DC
United States
Technical data:

Two single track running tunnels, L= 6,170 ft (1880m) each, (E Line) 3 Shafts and Cross Adits

Geology description:

Clay, sandy clay and sand, parts with some gravel and occasional boulders, decomposed bedrock and weathered bedrock.