Main Menu

You are here

Hampton Water Treatment Works - C079 Hampton Ozonation

Owner:
Client:
Service:
Design and Detailing of Shaft, Base and Breakouts
Estimated cost: Commencement:
December 31, 1996
Completion date:
December 31, 1997
Location:
Hampton
Middlesex
United Kingdom
Technical data:

10.3 m ID shaft, 33.5 m deep with a sprayed concrete (fcu 25 N/mm²), shell 250 mm thick. Two breakout eyes at base level, with 3.73 m diameter 400 mm thick collars.

Geology description:

Made Ground, Sand/Gravel Clay (London Clay) Water table at 1.26 m below ground level.

Geology types:
Categories:
Service areas: