Owner: | |||||
Client: | |||||
Service: | Feasibility Study
|
||||
Estimated cost: | $15,700,000
|
Commencement: | December 01, 1995
|
Completion date: | January 01, 1996
|
Location: | Athens Greece |
||||
Technical data: | Tunnel Length: 1.7 km Section: 12 m3 Proposed 1.7 km NATM tunnel with in-situ concrete lining as part of 20km surface pipe line water supply scheme. |
||||
Geology description: | Flysh, sandstone siltstone |
||||
Categories: | |||||
Service areas: |