Big Walker Tunnel - Rehabilitation

Owner:
Client:
Service:
Rehabilitation design services
Estimated cost: Commencement:
February 22, 2001
Completion date:
October 17, 2001
Location:
Richmond, VA
United States
Technical data:

2 two-lane highway tunnels constructed in 1971. Length: 4229 ft (1289 m) each; cross section: 907 sqft (84 m²). Design of remedial waterproofing and diversion system installed in air ducts and on vertical walls. Project focused on minimizing vehicular flow disruptions and lane closures.

Geology description:

Brown Shale

Geology types:
Categories:
Bid cost: Final cost:
$7,500,000
Service areas:
Big Walker Tunnel Portal
East River Mountain Tunnel Portal
Damaged Tunnel Lining
Water Ingress Damage to Tunnel Lining
Concrete Corrosion at Side Air Conduits and Tunnel Sidewall Drains