Owner: | |||||
Client: | |||||
Service: | Specialist sub-consultant for the analysis, design check, and design improvement recommendations of SCL structures.
|
||||
Estimated cost: | Commencement: | January 01, 2011
|
Completion date: | December 01, 2013
|
|
Location: | 25 Canada Square London E14 5LQ |
||||
Technical data: | |||||
Geology description: | The SCL tunnels are located in London Clay and Lambeth Group with overlying strata of terrace gravels and made ground. |
||||
Geology types: | |||||
Activity: | |||||
Categories: | |||||
Bid cost: | Final cost: | £16 billion GBP
|
|||
Service areas: | |||||
Construction methods: | |||||
Tunneling under: |
Crossrail is a 118km railway line along an east-west route across London. Its central section runs via 21km twin-bore tunnels connecting eight underground stations and represents one of the world's largest infrastructure projects. Dr. Sauer & Partners was assigned to provide Category III independent design checking services on the Sprayed Concrete Lining works for the complete Whitechapel and Fisher Street SCL structures. Additional 3D non-linear FEA and assessments were carried out for the wraparound and junction structures of the Liverpool St Station and the Bond St Station.