Service: | Rehabilitation design
|
||||
Estimated cost: | Commencement: | October 22, 2001
|
Completion date: | October 22, 2003
|
|
Location: | Temuco Chile |
||||
Technical data: | The 4500 m (14,760 ft) long Lonquimai Tunnel is a one lane, concrete lined road tunnel. The rehabilitation design foresees to line 3500 m (11,500 ft) of the tunnel with a flexible waterproofing membrane protected by a 5 cm (2 inch) thick shotcrete shell and the installation of a new drainage system. |
||||
Geology description: | Hard rock |
||||
Geology types: | |||||
Categories: | |||||
Bid cost: | Final cost: | $1,800,000
|
|||
Service areas: |