Service: | Dr. Sauer & Partners provided conceptual design and basic engineering.
|
||||
Estimated cost: | Commencement: | August 01, 2009
|
Completion date: | November 01, 2011
|
|
Location: | Los Andes Valparaíso Chile |
||||
Technical data: | |||||
Geology description: | The geological setting is dominated by the volcanic activities of the region and includes magmatic rocks such as monzonite, andesite, and dacite. |
||||
Geology types: | |||||
Activity: | |||||
Categories: | |||||
Bid cost: | Final cost: | $6 million USD
|
|||
Service areas: | |||||
Construction methods: |
Los Bronces copper mine, an open-pit operation at an altitude of 3500m ASL in the Chilean Andes, planned to utilise a tunnel for further deposit exploration and development. The project consisted of an 8.2km tunnel link between Los Bronces and Confluencia, connecting two processing plants. By applying drill and blast methods, a chamber was prepared to launch a 4.5m diameter tunnel boring machine which took over further excavation. A difficult geological and hydrological setting, extreme weather conditions as well as the high altitude and the rough terrain, provided a challenging environment.