Owner: | |||||
Client: | |||||
Service: | Rehabilitation design of a waterproofing system
|
||||
Estimated cost: | Commencement: | May 30, 1999
|
Completion date: | October 22, 2000
|
|
Location: | Jersey City, NJ United States |
||||
Technical data: | Design of a flexible membrane waterproofing system for the stations southern arch ceiling and mechanical room. Removal of approx. 2.5 inch (64 mm) of existing Gunite ceiling. Installation of remedial waterproofing and water ingress diversion system with structural support frame covered by a 2 inch (51 mm) shotcrete ceiling. |
||||
Geology description: | Not applicable to this project. |
||||
Categories: | |||||
Bid cost: | Final cost: | $276,000
|
|||
Service areas: |