Sauer, G., Zeidler, K. and Gall, V. |
The Doorframe Slab Method, Barrel Vault Method and Conventional NATM |
Boston, MA, USA |
June 14, 1993 |
|
Murphy, P. |
Jubilee line extension project |
London, UK |
January 1, 1993 |
|
Sauer, G. |
Design Concept for large Underground Openings in Soft Ground using NATM |
Herndon, VA, USA |
June 12, 1990 |
|
Sauer, Dr. G. |
Light at the End of the Tunnel |
Salzburg, Austria |
January 1, 1990 |
|
Sauer, G. and Gold, H. |
NATM Ground Support Concepts and their effect on Contract Practices |
Los Angeles, CA, USA |
June 14, 1989 |
|
Sauer, Dr. G. |
GSA Loose Rock Anchor Bolts |
Salzburg, Austria |
March 1, 1989 |
|
Sauer, Dr. G. |
Further Insights Into the NATM |
London, United Kingdom |
January 1, 1988 |
|
Sauer, G., Garret, V. |
Achieving a dry tunnel |
New Orleans, LA, USA |
June 14, 1987 |
|
Muir Wood, A. M. and Sauer, Dr. G. |
Efficacy and equity of the management of large underground projects |
San Francisco, CA,, USA |
May 3, 1981 |
|
Sauer, Dr. G. and Tanimoto, C. |
Stress measurement and stress re-arrangement caused by driving a tunnel |
Tokyo, Japan |
April 11, 1981 |
|
Sauer, Dr. G. and Pacher, F. |
Grosse Querschnitte in nicht standfestem Gebirge |
Salzburg, Austria |
January 1, 1979 |
|