| Service: | Design and Supervision of Leak Remediation Measures
|
||||
| Estimated cost: | Commencement: | Completion date: | |||
| Location: | Dallas, TX United States |
||||
| Technical data: | Leak remediation measures at the East and West Connector to the Mezzanine Level of City Place Station. Measures consistend of joint and crack grouting, the installation of a felxible membrane lining on the structural concrete lining and a cleaning of the existing drainage system. |
||||
| Geology description: | |||||
| Categories: | |||||
| Service areas: | |||||
| Construction methods: | |||||
Leak remediation measures at the East and West Connector to the Mezzanine Level of City Place Station. Measures consistend of joint and crack grouting, the installation of a felxible membrane lining on the structural concrete lining and a cleaning of the existing drainage system.