Service: | Design and Supervision of Leak Remediation Measures
|
||||
Estimated cost: | Commencement: | Completion date: | |||
Location: | Dallas, TX United States |
||||
Technical data: | Leak remediation measures at the East and West Connector to the Mezzanine Level of City Place Station. Measures consistend of joint and crack grouting, the installation of a felxible membrane lining on the structural concrete lining and a cleaning of the existing drainage system. |
||||
Geology description: | |||||
Categories: | |||||
Service areas: | |||||
Construction methods: |
Leak remediation measures at the East and West Connector to the Mezzanine Level of City Place Station. Measures consistend of joint and crack grouting, the installation of a felxible membrane lining on the structural concrete lining and a cleaning of the existing drainage system.