Main Menu

You are here

Presentations and lectures

Author Titlesort descending Location Date Files
Sauer, G., Sharma, B. A system for stress measurement in constructions in rock Zürich, Switzerland April 1, 1977
Zeidler, K. About the influence of compensation grouting on shotcrete tunnel linings at London Bridge Station Herndon, VA, USA April 1, 1998
Sauer, G., Garret, V. Achieving a dry tunnel New Orleans, LA, USA June 14, 1987
Egger, K., Sauer, G., Mergelsberg, W. Achieving dry stations and tunnel with flexible waterproofing membranes Sao Paulo, Brazil March 2, 2004
Egger, K.., Mergelsberg, W., Sauer, G Achieving Dry Stations and Tunnels with Flexible Waterproofing Membranes Sao Paulo, Brazil March 2, 2004
Egger, K.., Mergelsberg, W., Sauer, G Achieving Dry Stations and Tunnels with Flexible Waterproofing Membranes Sao Paulo, Brazil March 2, 2004
Urschitz, G. American infrastructure mega project Vienna, Austria December 1, 2002
Sauer, G. An application of new Austrian tunnelling method in difficult builtover areas in Frankfurt/Main metro Kurukushetra, India December 1, 1973
Sauer, G. Application and new techniques of NATM in large underground openings Warsaw, Poland June 5, 1980
Sauer, G., Gall, V. Application of the NATM in soft ground and mixed face conditions for the Toronto Island Airport Tunnel Toronto, Canada October 7, 1993
Sauer, G. Application of the New Austrian Tunnelling Method - its problems with technology and contracts Salzburg, Austria March 15, 1983
Sauer, G. Application of the New Austrian Tunnelling Method - its problems with technology and contracts Graz, Austria December 1, 1982
Sauer, G. Applying NATM - basic knowledge and new developments Leoben, Austria November 1, 1983
Benchmark for the Future: The largest SEM Soft Ground Tunnels in the United States for the Beacon Hill Station in Seattle May 14, 2013
Sauer, G. Berechnungen nach der Methode der Finite Elemente im U-Bahnbau Czech Republic October 1, 1973
Sauer, G. Big underground caverns in soft ground using NATM Seoul, South Korea June 24, 1991
Sauer, G., Crawford, H., McGuirk, A., Watson, A. Brno fast track system - application of NATM Brno, Czech Republic October 19, 1993
Sauer, G. Cement and resin grounting in dam constructions Cordoba, Argentina December 1, 1980
Sauer, G., Zeidler, G., Gall, V. Construction of Miscellaneous Underground Structures for Subway Projects New York, NY, USA May 26, 1999
Herndon, VA, 1999/06/01, USA DART Tunnel Inspection Manual, June 1999 June 28, 2013

Pages