Tunnel Design & Specialities

Seven Star- Herzeliya Tunnel

Service Performed
Tunnel Feasibility and Constructability Study
Commencement - Services
August 30, 2002
Completion - Services
October 21, 2003
Location
Tel Aviv
Israel
Technical data

Feasibility study for joint Light Rail / Motorway tunnel.

Geology description

Medium to stiff and silty clay, soft calcareous sandstone with seams of coral chalk and sand lenses.

Geology types
Final cost
$58,000
Service areas
Tunnel Design & Specialities
Plan and Profile
3D Model
Geology
Original Design: Cut & Cover Box
NATM Option:Twin Tunnel Section
NATM Option: Single Tunnel Section

Shepherd's Bush Station - MIP

Service Performed
Feasibility Study looking at ways of providing Congestion Relief and MIP lift access from surface to platform level, provision of tunnel and underground space design.
Estimated cost
$100,000
Commencement - Services
March 24, 2003
Location
London
United Kingdom
Technical data

Limited surface access and highly congested underground space with old cast iron tunnels platform tunnel very close together with passenger access and exit at the western end only. The feasibility design looked at options to improve the passenger space at the existing access and exit point, provide a second means of escape, MIP lift access to the surface and smoke extraction.

Geology description

Made Ground/Terrace Gravels overlying London Clay to depth. Groundwater approx 3m bgl. Limited clay cover above crown of tunnels.

Service areas
Tunnel Design & Specialities

3rd Street Light Rail Project - Chinatown Station

Service Performed
Tunneling Sub-Consultant on NATM Subway station design
Estimated cost
$763,800,000
Commencement - Services
January 01, 2002
Completion - Services
October 22, 2003
Location
San Francisco, CA
United States
Technical data

Conceptual and preliminary engineering services for the Chinatown Station of the MUNI Light Rail System in San Francisco. The responsibilities include constructability evaluations, alignment and construction alternatives studies and preparation of preliminary design documents. Alternatives, including deep bored tunnel vs. shallow NATM tunneling will be evaluated.

Geology description

Rugged bedrock hills consisting of highly deformed fractured rock of the Franciscan formation, overlain by sedimentary marine deposits (Colma Sands), fluvial deposits (Alluvium) and artificial fill. Very dense sands, inter-fingering of moderately plastic stiff silty clay.

Service areas
Tunnel Design & Specialities
Construction methods

Sewer relocation project Karl-Glaessing-Strasse

Service Performed
Detailed design including tender documentation
Commencement - Services
May 28, 1991
Completion - Services
October 19, 1992
Location
Wiesbaden, Hesse
Germany
Technical data

City sewage system: NATM tunnel under compressed air, construction of new scheme located 1 m below operating old brick lined sewage pipe.

Geology description

Tertiary clay, gravel and mud, (ground water table above tunnel roof).

Description

City sewage system: NATM tunnel under compressed air (0.25 bar), construction of new scheme located 1m below operating old brick lined sewage pipe. Steel plate lining is closed to the face (2 m behind) to reduce air pressure losses.

Categories
Final cost
$1,500,000
Service areas
Tunnel Design & Specialities
Special Construction techniques
Longitudinal and Cross Section

Pressure Tunnel Ralco

Owner
Service Performed
NATM design and application support
Commencement - Services
June 29, 2001
Completion - Services
December 30, 2004
Location
Alto Bio-Bio
Chile
Technical data

Pressure tunnel with a lenght of 7 km (4.3 mi) and a diameter of 10 m (32.8 ft). Excavation in full face, top heading and invert according to encountered rock conditions. Initial support with lattice girders, steel fiber reinforced shotcrete and rock bolts. Grouting pipe spiling as pre-support for areas with deteriorated rock.

Geology description

Volcanic rock and tertiary sediments; lavas and lavas brechosas andesitas, lavas con niveles de conglomerados finos y arenisacas. Rock intrusions in the form of diorite and diabase.

Geology types
Categories
Final cost
$50,000,000
Service areas
Tunnel Design & Specialities
Cross Section with Excavation Steps
Construction Site - Dam in Background
Power Tunnel Outlet
Excavation of Invert
Installation of Shotcrete Lining at Tunnel Invert

Brighton Storm Water Relief Scheme

Service Performed
NATM design of the shaft bottom, TBM chamber, mucking bunker and backshunt
Commencement - Services
June 27, 1993
Completion - Services
November 27, 1993
Location
Brighton
United Kingdom
Technical data

11.6 m diameter shaft, approx. 45 m deep. Concrete segmental construction to 24.95 m OD. NATM construction to the base at -43.25 m OD with a 7.5 m span TBM launch chamber and mucking bunker, 40 m long, and 4.0 m diameter backshunt adit, 13.5 m long.

Geology description

Made Ground overlying Marine Gravels overlying upper Chalk. The NATM shaft and adits were excavated within the Upper Chalk which had numerous flint bands. Seawater was consistently flowing trough the joints and flint bands.

Geology types
Categories
Final cost
$500,000
Service areas
Tunnel Design & Specialities
Longitudinal Section and Cross Section
TBM in Launch Shaft

Godar-E-Landar, Hydro Electric Power Scheme

Service Performed
Consultant
Commencement - Services
December 30, 1992
Completion - Services
December 30, 1993
Location
Iran
Technical data

Hydro Electric Power Scheme. Diversion Works: 2 tunnels (1 km each). Outlet and Intake open cut slopes and bottom outlet shaft.

Geology description

Slope debris, Conglomerate, Siltstone, Sandstone.

Description

A immediate shotcrete sealing degrease tendency of deterioration.

Categories
Service areas
Tunnel Design & Specialities
Landscape of the shotcrete portal area
Cross section, excavation & support completed
FEM Calculation Sequences
Top Heading Bench Excavation
Polar Visualization of Outlet and Intake Slopes

Yacambu-Quibor-Tunnel

Service Performed
Advice and Recommendations for Experimental Investigation Section.
Commencement - Services
November 30, 1990
Completion - Services
December 31, 1991
Location
Venezuela
Technical data

24.4 km long transfer tunnel, 4.2 m diameter.

Geology description

Phyllite, Sandstone.

Description

L= 24.368 m Water diversion tunnel TBM drive was stopped due to high rock pressure. One TBM got stuck and was lost.

Categories
Service areas
Tunnel Design & Specialities

Thissavros Dam Project

Service Performed
NATM Consultant for Underground Excavation and Support.
Commencement - Services
October 30, 1990
Completion - Services
December 30, 1990
Location
Athens
Greece
Technical data

Power generation complex including power house cavern, shaft, tunnels and galleries etc.

Geology description

Gneiss (areas of small faults, tectonised rock or rock crossed by a dense network of pegmatite and aplite veins).

Geology types
Categories
Service areas
Tunnel Design & Specialities

Ilarion Hydroelectric Project (160 MW)

Service Performed
Member of board of consultants
Commencement - Services
October 29, 1990
Completion - Services
December 29, 1995
Location
Athens
Greece
Technical data

Earth dam, two inclined spillway shafts and tunnels (12 m ID, inclined length 140 m, horizontal length 550 m), diversion tunnel (500 m long), power tunnel (8,5 m ID, 480 m long), surface power house and 3 km long grouting tunnel.

Geology description

Slope wash, Limestone, Siltstone, Sandstone, Shale, Cherts.