Slurry Wall

Sound Transit Beacon Hill Station

Service Performed
Optimizing station and tunnel configurations, Interpreting geologic information, preliminary and detailed design, developing 3D Finite Element Models and performing structural and seismic design.
Commencement - Services
January 01, 2002
Completion - Services
January 01, 2009
Location
401 S. Jackson Street
Seattle, WA 98104
United States
Geology description

Beacon Hill Station is located 49 m below the ground surface in complex glacial soils with multiple groundwater horizons.

Geology types
Description

Beacon Hill Station is part of the 22.5 km initial segment of Sound Transit's Central Link Light Rail. It is located 49 m below the ground surface in complex glacial soils with multiple groundwater horizons. The project comprises deep mined station tunnels and two 1.5 km long running tunnels excavated using a tunnel boring machine. The mined station was excavated through compressible glacial soils with multiple groundwater horizons using conventional mining techniques. The access shafts and station headhouses were constructed using slurry walls and cut-and-cover techniques.

Activity
Construction methods
Special Construction techniques
Slurry Wall
Tunneling under
Tunnel length
1.5km
Beacon Hill Station Layout
Tunnel Excavation under way
Project number
418C
Final cost
$250 million USD

Tottenham Court Road Station Upgrade Design

Client
Service Performed
Design of numerous temporary sprayed concrete lined shaft and tunnel structures, and the waterproofing system for the upgrade of the existing London Underground Tottenham Court Road Station.
Commencement - Services
August 01, 2007
Completion - Services
January 01, 2010
Location
Oxford Street
London
London
W1D 1AN
United Kingdom
Technical data

Tottenham Court Road Station is a London Underground station situated in central London. The station serves as an interchange between the Central and Northern lines. Over 150,000 passengers use the station daily.

Geology description

London Clay Formation (over-consolidated, very stiff to hard clay)

Geology types
Description

Currently over 150,000 passengers use the station daily and with the completion of Crossrail in 2017, passenger numbers are expected to increase to over 200,000. The tunnels are of diameters between 4.0m and 11.0m and typically consist of a temporary sprayed concrete primary lining, a spray applied waterproofing membrane and a cast-in-place concrete secondary lining. Multiple transitions and interfaces to existing LU structures make for a challenging design and construction project under the busy streets of central London.

Activity
Final cost
$480,000,000
Construction methods
Special Construction techniques
Slurry Wall
Tunneling under
Max Excavation Area (m2)
23-104m2
Tunnel length
13-104m
Overview of new tunnel works
General arrangement of sprayed concrete overbridge
Northern line concourse tunnel with cross passages
Installation of steel transfer beam
Excavation and support of Northern line concourse tunnel
Removal of existing backfilled structure
Project number
411D
Final cost
£480 million GBP

Beacon Hill Station

Service Performed
NATM / SEM station design and construction supervision.
Estimated cost
$250,000,000
Commencement - Services
February 26, 2000
Completion - Services
December 28, 2007
Location
401 S. Jackson Street
Seattle, WA 98104
United States
Technical data

NATM Light Rail Station located 150 ft (46 m) beneath surface. Station complex includes central elevator/access shaft, concourse, opposing platform tunnels and cross passages. Platform Tunnel Section: 36 ft w x 31 ft h; Platform Tunnel Area: 925 sqft (86 m²); total Station Excavation Area: 63,000 sqft (5853 m²).

Geology description

Over-consolidated glacial clay and till with fracutured zones. Intermittent sand and silt layers with perched groundwater.

Geology types
Description

The Beacon Hill Tunnels and Station are part of the 22.5km initial segment of the Sound Transit Central Link Light Rail Line that will establish a high capacity commuter connection from downtown Seattle to Tacoma. The 1300m running tunnel under Beacon Hill will be mined by Earth Pressure Balance Machine (EPB), while the deep mined Station will be constructed using slurry walls and the New Austrian Tunneling Method (NATM), referred to as Sequential Excavation Method (SEM) for this project.

Activity
Bid cost
$280,000,000
Final cost
$280,000,000
Construction methods
Special Construction techniques
Tunneling under
Max Overburden
Min:120 Max:140
Beacon Hill Station layout
Tunnel excavation under way
3D rendering of Beacon Hill Station complex
Platform tunnel cross section
Schwind Thomas
Installation of Vacuum Dewatering
Rendering of Beacon Hill Station
Project number
325
Final cost
$280 million USD