City Trunk Line South

Client
Service Performed
Site supervision for SEM/NATM works
Commencement - Services
July 01, 2016
Completion - Services
November 01, 2016
Location
111 Hope St
Los Angeles, CA 90012
United States
Geology description

Wash deposits consisting of moderately dense sand, silty sands and sandy silts.

Description

The constructed tunnel is part of the City Trunk Line project in L.A. (replacement of an existing water trunk line). The tunnel is located at the junction of Riverside Drive and Whitsett Avenue. It is between eight and ten feet in diameter and has a total length of 252 feet. To fit between the existing structures in the ground (foundation piles of a bridge), the tunnel follows an S-shape and is divided into sections with different geometries. The tunnel was built using NATM/SEM construction methods. The primary support measures included fibre reinforced shotcrete, lattice girders and spiles (rebar spiles and grouted pipe spiles).

Activity
Categories
Construction methods
NATM, SCL
South shaft
Completed tunnel section
Project number
420E
Final cost
$14.5 million USD

Brenner Base Tunnel - Lot H51 Pfons-Brenner

Owner
Service Performed
Dr. Sauer & Partners provided tender support services.
Commencement - Services
December 01, 2016
Completion - Services
April 18, 2017
Location
Innsbrucker Bundesstraße 67
5020 TYROL
Austria
Geology description

Located within the Alps, the geology comprises phyllite, schist, marble and gneiss including main fault zones as well as major water ingress sections combined with a maximum overburden of 1300m.

Geology types
Description

The Brenner Base Tunnel (BBT) is a 64km long railway tunnel connecting Austria and Italy. Once completed, it will be the world's longest rail link underground. In addition to the two main tubes, the project comprises a complex set up of exploration adits, crosscuts, emergency stops and additional access tunnels, excavated by TBM and SCL methods. Dr. Sauer & Partners provided tender support services for the 18km lot H51 Pfons-Brenner and was responsible for creating the bid documents as well as conducting QA/QC services. The documents covered issues such as TBM choice, annular gap filling, reuse of excavated rock, rail delivery of construction materials, construction logistics and pre-excavation grouting.

Activity
Categories
Construction methods
NATM, TBM
Max Overburden
1300
BBT alignment (courtesy of BBT SE)
Lot H51 alignment (courtesy of BBT SE)
Project number
486C
Final cost
€1.3 billion EUR

University Link - Execution

Service Performed
Site supervision services, consulting and monitoring.
Commencement - Services
December 01, 2011
Completion - Services
August 01, 2012
Location
401 S. Jackson Street
Seattle, WA 98104
United States
Geology description

The geology along the alignment consists of over-consolidated glacial clay and till with fractured zones, as well as sand and silt layers.

Geology types
Description

University Link is a 5km light rail extension that runs in twin-bored tunnels from Downtown Seattle north to the University of Washington, with stations at Capitol Hill and on the University of Washington campus. The project further includes 20 cross passages located in soft ground and a maximum design water head of 60m. To deal with the prevailing geological conditions, specific ground support categories were developed. Steel fibre reinforced initial lining, sheet membrane waterproofing and CIP final lining were utilised.

Activity
Construction methods
NATM, TBM
Cross passage excavation
Propping of TBM tunnel at cross passage
Probe drilling at cross passage
Finished cross passage
Project number
262E
Final cost
$1.6 billion USD

University Link - Design

Service Performed
Sub-consultant for NATM/SEM design and waterproofing design.
Commencement - Services
July 02, 2007
Completion - Services
January 02, 2009
Location
401 S. Jackson Street
Seattle, WA 98104
United States
Geology description

The geology along the alignment consists of over-consolidated glacial clay and till with fractured zones, as well as sand and silt layers.

Geology types
Description

University Link is a 5km light rail extension that runs in twin-bored tunnels from Downtown Seattle north to the University of Washington, with stations at Capitol Hill and on the University of Washington campus. The twin-bored tunnels are connected with 20 cross passages. Dr. Sauer & Partners performed the temporary and final support design for the cross passages. This included the design of excavation and support measures and the development of specific ground support categories, settlement analyses, and the structural analyses of initial and permanent lining.

Activity
Construction methods
NATM, TBM
T Cross Passage
3D Finite Element Model
Project number
262D
Final cost
$1.6 billion USD

Crossrail C121 SCL Design CAT3 Check

Service Performed
Specialist sub-consultant for the analysis, design check, and design improvement recommendations of SCL structures.
Commencement - Services
January 01, 2011
Completion - Services
December 01, 2013
Location
25 Canada Square
London
E14 5LQ
United Kingdom
Geology description

The SCL tunnels are located in London Clay and Lambeth Group with overlying strata of terrace gravels and made ground.

Geology types
Description

Crossrail is a 118km railway line along an east-west route across London. Its central section runs via 21km twin-bore tunnels connecting eight underground stations and represents one of the world's largest infrastructure projects. Dr. Sauer & Partners was assigned to provide Category III independent design checking services on the Sprayed Concrete Lining works for the complete Whitechapel and Fisher Street SCL structures. Additional 3D non-linear FEA and assessments were carried out for the wraparound and junction structures of the Liverpool St Station and the Bond St Station.

Activity
Construction methods
NATM
Tunneling under
FEM results of binocular structure at Fisher Street Crossover
Fisher Street Crossover under construction
Project number
222C2
Final cost
£16 billion GBP

Reshen Kalimash Motorway Project

Service Performed
Dr. Sauer & Partners in joint venture with iC Consulenten provided mitigation and tunnel stabilisation as well as NATM redesign following a tunnel collapse.
Commencement - Services
November 01, 2009
Completion - Services
July 01, 2010
Location
Sami Frasheri No. 33
Tirana
Albania
Geology description

The geological setting is influenced by the Alpine geosyncline resulting in a complex tectonic behaviour of a variety of igneous and metamorphic rocks cut by major fault zones.

Geology types
Description

A major collapse during construction of the Thierre Tunnel in 2009 led government officials to call on NATM experts to come up with an innovative fix for the 5.6km, two-lane twin tunnel, which is part of the new Reshen Kalimash Motorway. Recommended stabilisation measures by the Dr. Sauer/iC JV such as backfilling, ribs and fibre shotcrete were implemented and halted creep movements. An alternative design was developed and replaced the original horseshoe profile by an ovoid shape. Pre-treatment, excavation works and support installation were accompanied by extensive monitoring.

Activity
Final cost
$1,000,000,000
Construction methods
NATM
Tunneling under
Stabilisation measures: Backfill and fibre shotcrete "egg"
Ovoid shape emerging from horseshoe profile
Project number
428E
Final cost
$1 billion USD

Edmonton Light Rail

Client
Service Performed
Dr. Sauer and Partners provided construction support services and supervision of the excavation of the Light Rail Tunnels, which were constructed using NATM.
Commencement - Services
August 01, 2011
Completion - Services
January 01, 2013
Location
1 Sir Winston Churchill Sq NW
Edmonton, AB T5J 2R7
Canada
Geology description

Glacially controlled terrain comprising clay, silt and sand deposits underlain by Mesozoic bedrock consisting of sandstone and shale.

Geology types
Description

The City of Edmonton built a 3.3km Light Rail Train extension from Churchill Station to the Northern Alberta Institute of Technology. Approximately 670m of the extension are underground consisting of ca. 430m of twin tunnels of 6m nominal diameter. NATM/SEM tunneling was applied. The software 2DOC, which was at that point used in North America for the first time, allowed real-time tracking of all geotechnical instruments on the project, as well as the recording of the actual geotechnical conditions and the grout support elements installed.

Activity
Final cost
$300,000,000
Construction methods
NATM
Tunneling under
Excavation under way
Tunnel face
Project number
437E
Final cost
$300 million CAD

Eglinton Crosstown LRT - Design

Service Performed
Preliminary and detailed SEM tunnel design. Primary and secondary lining, waterproofing and interior structures design on three SEM stations (namely Laird, Avenue and Oakwood).
Commencement - Services
November 01, 2015
Completion - Services
December 01, 2021
Location
97 Front Street West
Toronto, ON M5J1E6
Canada
Geology description

Glacial depositional systems created a complex distribution of heavily overconsolidated till layers, separated by interstadial stratified deposits of glaciolacustrine clay, silt, and sand.

Geology types
Description

The Crosstown is a light rail transit line, which is part of the regional transportation plan for the Greater Toronto and Hamilton Area. The project will provide a 19km corridor across Eglinton Avenue, connecting ten stops at grade and 15 underground stations with a 10km twin-bored tunnel. Dr G. Sauer & Partners provided detailed design for Oakwood, Avenue, and Laird stations. A combination of Cut-and-Cover construction for the shafts and mined techniques (SEM) for the tunnels was utilised. Excavation and support measures were tailored to the ground conditions. Finite element analyses were carried out to determine structural capacity of linings and trigger values to meet stingent settlement criteria at the surface.

Activity
Construction methods
NATM
Tunneling under
Route map (www.thecrosstown.ca)
3D Finite Element Analysis Station, Box, Crosscut, Cavern, Tunnels
Project number
467D
Final cost
$8.25 billion CAD
Completion date
Ongoing

Silverline Phase III

Service Performed
Sub-consultant for NATM design.
Commencement - Services
January 01, 2003
Completion - Services
January 01, 2008
Location
500 Arborway
Boston, MA 02130
United States
Geology description

Made ground, peat, glacial till (cohesive, plastic), Boston Blue Clay and sand.

Geology types
Description

Silver Line Phase III is an underground extension of the Silver Line from the current terminal at South Station into Downtown Boston. The tunnels through Boston's Chinatown lie up to 25m below surface and include ca. 1400m long-running tunnels, two stations and complex underground junctions. The NATM design alternatives for LRT / Busway tunnels are located beneath existing subway stations and running tunnels. 3D modelling tools were utilised to create multiple alignments.

Activity
Final cost
$550,000,000
Construction methods
NATM
Tunneling under
3D rendering of the Silverline Phase III alignment
NATM alternative beneath MTA's Chinatown Station
Project number
347D1
Final cost
$550 million USD

Cigar Lake Mine Development

Owner
Client
Service Performed
Site supervision services, consulting, monitoring and on-site engineering performed by senior engineer and two tunnel inspectors. Subsequent design for tunnels and junctions supporting mine development.
Commencement - Services
September 01, 2012
Completion - Services
May 01, 2020
Location
2121, 11th St W
Saskatoon, SK S7M 1J3
Canada
Geology description

Highly thermo hydraulically weathered metapelites in form of weak rock and clayey-silty-sandy soils, highly anisotropic, cut with slickensided graphitic planes.

Geology types
Description

Cameco's Cigar Lake is the world's highest grade uranium deposit. It is considered one of the world's most technically challenging uranium deposits to mine. The ore body and the ground around has to be bulk frozen prior to extraction of the ore using high pressure water jets. Development of the freeze/production cross-cuts takes place beneath the ore body in unstable, soil-like, highly weathered and anisotropic rock. A flexible shotcrete lining with longitudinal slots and special yielding elements together with systematic rock bolting were utilized to cope with squeezing ground conditions. Site presence and additional engineering and design efforts supported the mine development for tunnels and junctions.

Categories
Final cost
$50,000,000
Construction methods
NATM
Special Construction techniques
Pocket excavation in unstable ground conditions
Installed yielding elements prior to spraying shotcrete
Project number
455E
Project Type
Final cost
$50 million CAD
Completion date
Ongoing